{"id":667,"date":"2025-09-02T22:16:00","date_gmt":"2025-09-02T22:16:00","guid":{"rendered":"https:\/\/rikoncranes.com\/?post_type=news-and-events&#038;p=667"},"modified":"2025-12-02T22:19:09","modified_gmt":"2025-12-02T22:19:09","slug":"rikon-repeats-for-first-dry-port-terminal-uzbekistan","status":"publish","type":"news-and-events","link":"https:\/\/rikoncranes.com\/en\/news-and-events\/rikon-repeats-for-first-dry-port-terminal-uzbekistan\/","title":{"rendered":"RIKON repeats for First Dry Port Terminal\u00a0(Uzbekistan)"},"content":{"rendered":"\n<p>Following the successful implementation of the first project, which was reported earlier, the company focused on the next one, in accordance with the previously concluded contract. This repeat order serves as a strong testament to RIKON&#8217;s reputation as a reliable supplier of high-tech, high-performance lifting equipment.<\/p>\n\n<p>The new crane is identical to the previously installed unit and features a maximum lifting capacity of 41 tons under spreader. Key technical specifications include a 10.8 m cantilever length, 7 m operating outreach, and 17.1 m span between the legs. The crane is equipped with advanced control systems from leading global manufacturers, ensuring exceptional\u00a0reliability, precision in operations, and energy efficiency.<\/p>\n\n<p>Like the first crane, the new RMG will handle container operations in the terminal&#8217;s expansion area, which serves as a crucial link in the international &#8220;East-West&#8221; and &#8220;North-South&#8221; transport corridors. The development of First Dry Port Terminal&#8217;s infrastructure, located on the historic Great Silk Road, holds strategic importance for regional economic development and enhanced trade connectivity between Asia and Europe. The terminal spans 22 hectares and features 8 railway tracks with a total length of 5,300 meters, a covered customs warehouse, an open customs area, a customs control zone, and loading\/unloading platforms.<\/p>\n\n<p>The commissioning of this additional equipment will enable the terminal to handle growing cargo traffic more efficiently, boost operational productivity, and strengthen its position as a strategic logistics hub of international importance.<\/p>\n\n<p>RIKON serially manufactures gantry container cranes for ports and container terminals, and this completed project reaffirms the company&#8217;s status as a reliable partner for modern logistics infrastructure development.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>JSC &#8220;RIKON&#8221; has successfully commissioned a second RMG-type container gantry crane at the facilities of &#8220;First Dry Port Terminal&#8221; LLC in Tashkent.<\/p>\n","protected":false},"featured_media":668,"template":"","meta":{"_acf_changed":false},"class_list":["post-667","news-and-events","type-news-and-events","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v1 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>RIKON repeats for First Dry Port Terminal\u00a0(Uzbekistan) - RIKON<\/title>\n<meta name=\"description\" content=\"Subscribe and get our latest news and announcements about upcoming events delivered straight to your mailbox.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/rikoncranes.com\/en\/news-and-events\/rikon-repeats-for-first-dry-port-terminal-uzbekistan\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"RIKON repeats for First Dry Port Terminal\u00a0(Uzbekistan) - RIKON\" \/>\n<meta property=\"og:description\" content=\"Subscribe and get our latest news and announcements about upcoming events delivered straight to your mailbox.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/rikoncranes.com\/en\/news-and-events\/rikon-repeats-for-first-dry-port-terminal-uzbekistan\/\" \/>\n<meta property=\"og:site_name\" content=\"RIKON\" \/>\n<meta property=\"article:modified_time\" content=\"2025-12-02T22:19:09+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/rikoncranes.com\/wp-content\/uploads\/2025\/12\/First-Dry-Port-Terminal-Uzbekistan-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1706\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/rikoncranes.com\\\/en\\\/news-and-events\\\/rikon-repeats-for-first-dry-port-terminal-uzbekistan\\\/\",\"url\":\"https:\\\/\\\/rikoncranes.com\\\/en\\\/news-and-events\\\/rikon-repeats-for-first-dry-port-terminal-uzbekistan\\\/\",\"name\":\"RIKON repeats for First Dry Port Terminal\u00a0(Uzbekistan) - RIKON\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/rikoncranes.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/rikoncranes.com\\\/en\\\/news-and-events\\\/rikon-repeats-for-first-dry-port-terminal-uzbekistan\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/rikoncranes.com\\\/en\\\/news-and-events\\\/rikon-repeats-for-first-dry-port-terminal-uzbekistan\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/rikoncranes.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/First-Dry-Port-Terminal-Uzbekistan-scaled.jpg\",\"datePublished\":\"2025-09-02T22:16:00+00:00\",\"dateModified\":\"2025-12-02T22:19:09+00:00\",\"description\":\"Subscribe and get our latest news and announcements about upcoming events delivered straight to your mailbox.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/rikoncranes.com\\\/en\\\/news-and-events\\\/rikon-repeats-for-first-dry-port-terminal-uzbekistan\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/rikoncranes.com\\\/en\\\/news-and-events\\\/rikon-repeats-for-first-dry-port-terminal-uzbekistan\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/rikoncranes.com\\\/en\\\/news-and-events\\\/rikon-repeats-for-first-dry-port-terminal-uzbekistan\\\/#primaryimage\",\"url\":\"https:\\\/\\\/rikoncranes.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/First-Dry-Port-Terminal-Uzbekistan-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/rikoncranes.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/First-Dry-Port-Terminal-Uzbekistan-scaled.jpg\",\"width\":2560,\"height\":1706,\"caption\":\"RIKON repeats for First Dry Port Terminal\u00a0(Uzbekistan)\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/rikoncranes.com\\\/en\\\/news-and-events\\\/rikon-repeats-for-first-dry-port-terminal-uzbekistan\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/rikoncranes.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"News and Events\",\"item\":\"https:\\\/\\\/rikoncranes.com\\\/en\\\/news-and-events\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"RIKON repeats for First Dry Port Terminal\u00a0(Uzbekistan)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/rikoncranes.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/rikoncranes.com\\\/en\\\/\",\"name\":\"RIKONCRANES.COM\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/rikoncranes.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/rikoncranes.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/rikoncranes.com\\\/en\\\/#organization\",\"name\":\"RIKON JSC\",\"url\":\"https:\\\/\\\/rikoncranes.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/rikoncranes.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/rikoncranes.com\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/site-logotype.svg\",\"contentUrl\":\"https:\\\/\\\/rikoncranes.com\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/site-logotype.svg\",\"width\":1160,\"height\":203,\"caption\":\"RIKON JSC\"},\"image\":{\"@id\":\"https:\\\/\\\/rikoncranes.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"RIKON repeats for First Dry Port Terminal\u00a0(Uzbekistan) - RIKON","description":"Subscribe and get our latest news and announcements about upcoming events delivered straight to your mailbox.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/rikoncranes.com\/en\/news-and-events\/rikon-repeats-for-first-dry-port-terminal-uzbekistan\/","og_locale":"en_US","og_type":"article","og_title":"RIKON repeats for First Dry Port Terminal\u00a0(Uzbekistan) - RIKON","og_description":"Subscribe and get our latest news and announcements about upcoming events delivered straight to your mailbox.","og_url":"https:\/\/rikoncranes.com\/en\/news-and-events\/rikon-repeats-for-first-dry-port-terminal-uzbekistan\/","og_site_name":"RIKON","article_modified_time":"2025-12-02T22:19:09+00:00","og_image":[{"width":2560,"height":1706,"url":"https:\/\/rikoncranes.com\/wp-content\/uploads\/2025\/12\/First-Dry-Port-Terminal-Uzbekistan-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/rikoncranes.com\/en\/news-and-events\/rikon-repeats-for-first-dry-port-terminal-uzbekistan\/","url":"https:\/\/rikoncranes.com\/en\/news-and-events\/rikon-repeats-for-first-dry-port-terminal-uzbekistan\/","name":"RIKON repeats for First Dry Port Terminal\u00a0(Uzbekistan) - RIKON","isPartOf":{"@id":"https:\/\/rikoncranes.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/rikoncranes.com\/en\/news-and-events\/rikon-repeats-for-first-dry-port-terminal-uzbekistan\/#primaryimage"},"image":{"@id":"https:\/\/rikoncranes.com\/en\/news-and-events\/rikon-repeats-for-first-dry-port-terminal-uzbekistan\/#primaryimage"},"thumbnailUrl":"https:\/\/rikoncranes.com\/wp-content\/uploads\/2025\/12\/First-Dry-Port-Terminal-Uzbekistan-scaled.jpg","datePublished":"2025-09-02T22:16:00+00:00","dateModified":"2025-12-02T22:19:09+00:00","description":"Subscribe and get our latest news and announcements about upcoming events delivered straight to your mailbox.","breadcrumb":{"@id":"https:\/\/rikoncranes.com\/en\/news-and-events\/rikon-repeats-for-first-dry-port-terminal-uzbekistan\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/rikoncranes.com\/en\/news-and-events\/rikon-repeats-for-first-dry-port-terminal-uzbekistan\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/rikoncranes.com\/en\/news-and-events\/rikon-repeats-for-first-dry-port-terminal-uzbekistan\/#primaryimage","url":"https:\/\/rikoncranes.com\/wp-content\/uploads\/2025\/12\/First-Dry-Port-Terminal-Uzbekistan-scaled.jpg","contentUrl":"https:\/\/rikoncranes.com\/wp-content\/uploads\/2025\/12\/First-Dry-Port-Terminal-Uzbekistan-scaled.jpg","width":2560,"height":1706,"caption":"RIKON repeats for First Dry Port Terminal\u00a0(Uzbekistan)"},{"@type":"BreadcrumbList","@id":"https:\/\/rikoncranes.com\/en\/news-and-events\/rikon-repeats-for-first-dry-port-terminal-uzbekistan\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/rikoncranes.com\/en\/"},{"@type":"ListItem","position":2,"name":"News and Events","item":"https:\/\/rikoncranes.com\/en\/news-and-events\/"},{"@type":"ListItem","position":3,"name":"RIKON repeats for First Dry Port Terminal\u00a0(Uzbekistan)"}]},{"@type":"WebSite","@id":"https:\/\/rikoncranes.com\/en\/#website","url":"https:\/\/rikoncranes.com\/en\/","name":"RIKONCRANES.COM","description":"","publisher":{"@id":"https:\/\/rikoncranes.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/rikoncranes.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/rikoncranes.com\/en\/#organization","name":"RIKON JSC","url":"https:\/\/rikoncranes.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/rikoncranes.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/rikoncranes.com\/wp-content\/uploads\/2025\/11\/site-logotype.svg","contentUrl":"https:\/\/rikoncranes.com\/wp-content\/uploads\/2025\/11\/site-logotype.svg","width":1160,"height":203,"caption":"RIKON JSC"},"image":{"@id":"https:\/\/rikoncranes.com\/en\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/rikoncranes.com\/en\/wp-json\/wp\/v2\/news-and-events\/667","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rikoncranes.com\/en\/wp-json\/wp\/v2\/news-and-events"}],"about":[{"href":"https:\/\/rikoncranes.com\/en\/wp-json\/wp\/v2\/types\/news-and-events"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rikoncranes.com\/en\/wp-json\/wp\/v2\/media\/668"}],"wp:attachment":[{"href":"https:\/\/rikoncranes.com\/en\/wp-json\/wp\/v2\/media?parent=667"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}